AndonEAM documentation

Start with the workflow.
Keep people accountable.

Practical orientation for teams preparing an AndonEAM implementation—from source evidence and asset context to engineering review and controlled execution.

Core workflows

One governed loop, three areas of work

Each workflow should begin with traceable inputs and end with an accountable human decision. The exact sequence is configured around the operating context agreed during implementation.

01Reliability strategy

RCM analysis

Define the asset boundary, assemble approved source material, develop functions and failure logic, then route recommendations through engineering review.

Explore the RCM workflow
02Asset intelligence

Asset monitoring

Map equipment and signals, agree operating context and thresholds, validate alert behavior, and preserve the evidence used for each decision.

Explore asset monitoring
03Controlled execution

Maintenance planning

Translate an approved intervention into a reviewable plan with the right scope, constraints, supporting evidence, and hand-off to the system of record.

Explore maintenance planning

Before configuration

Prepare a defensible starting point

Perfect data is rarely available. What matters first is knowing what is authoritative, what is incomplete, and who is qualified to resolve uncertainty.

Asset context

  • A named business owner and engineering reviewer
  • A bounded pilot asset or system
  • Asset hierarchy and equipment identifiers
  • Known operating modes and duty expectations

Source evidence

  • Current manuals, drawings, and datasheets
  • Maintenance plans and available work history
  • Known failure history and existing risk assessments
  • Source ownership, revision, and approval status

Governance

  • Defined review and approval authorities
  • Site safety and change-management requirements
  • Acceptance measures for the pilot
  • A process for correcting and superseding outputs
Read the detailed data-readiness field guide

Implementation path

Move from a bounded pilot to operational use

The sequence below is a planning model, not a promise of a fixed deployment timeline. Scope, data condition, integration complexity, and site assurance requirements affect the implementation plan.

  1. 01

    Discover

    Agree the business outcome, asset boundary, stakeholders, risks, and evidence available for a focused starting point.

  2. 02

    Map

    Align site terminology, asset identifiers, data sources, user roles, and any systems that may exchange information.

  3. 03

    Configure

    Set up the agreed workflow, review gates, and integration scope without treating generated content as pre-approved engineering advice.

  4. 04

    Validate

    Run representative cases with qualified reviewers, record exceptions, and confirm acceptance criteria before operational use.

  5. 05

    Operate

    Monitor workflow quality, access, changes, and feedback while maintaining clear accountability for every approved decision.

Support

Bring the asset context. We’ll map the next step.

For implementation questions, describe the workflow, systems, and asset boundary you want to evaluate. Do not send confidential operational data by email unless an approved exchange method has been established.