From notification to a planner-reviewed work-order draft.
AndonEAM uses available notification context, equipment records, and maintenance documentation to draft work-order fields for planner review. Materials, durations, safety context, and release decisions remain subject to customer data, configured integrations, and authorized approval.
The Problem
After a defect is flagged, planners still need to gather equipment history, confirm work scope, verify parts, and assemble an executable job plan. Repetitive context gathering competes with the engineering judgement needed to prioritize and prepare higher-risk work.
The effort varies by task complexity, data quality, material availability, site rules, and the level of review required.
A queue can grow while planners gather equipment history, clarify scope, locate parts, and prepare a complete work package.
Missing materials, vague task descriptions, or absent safety context can force technicians to stop and seek clarification on-site.
Time spent recreating standard task context reduces the time available for critical analysis, coordination, and exception handling.
When planning can't keep up with notifications, the backlog grows silently until it becomes a safety and compliance risk.
How It Works
AndonEAM connects source data, structured drafts, engineering review, and approved downstream records in a governed maintenance workflow.
A technician, operator, or connected monitoring source raises a notification within the agreed workflow. It may begin with a condition-based alert, an inspection finding, or a manual observation.
The system uses the available notification context, equipment type, failure-mode records, maintenance history, and manufacturer documentation to propose what work may be required. Missing or conflicting source information is resolved by the planner.
A draft can include proposed operations, task descriptions, duration estimates, candidate materials, and relevant safety context. Inventory status is included only through configured data sources, and safety or isolation content never replaces site procedures.
An authorized maintenance planner reviews the generated draft in an approval interface, edits fields, verifies materials and safety requirements, records judgement, and decides whether the work order is ready for release.
After approval, work orders can be mapped to a target CMMS through integrations included in the project scope. The customer validates field mappings, master data, release controls, and any safety or cost information before operational use.
Capabilities
The workflow uses the notification and available equipment history, manufacturer documentation, and maintenance-library records to draft operations, materials, and duration fields for planner review.
Suggests candidate spare parts from available equipment BOM and inventory data. Planners confirm the correct part, quantity, interchangeability, and current availability before release.
Approved work orders can be transferred through configured integrations after customer-specific field mapping, permissions, and release controls have been tested.
Can surface candidate hazards, PPE references, and isolation context found in approved source material. It does not create authoritative isolation boundaries or permits; qualified site personnel validate all safety, LOTO, and regulatory requirements.